Productivity & delivery

Get the sprint back. Keep the final word.

Agents take the repetitive work: drafting cases, writing scripts, preparing data, fixing locators, reading logs. Your team approves the cases and decides the release.

What changes, concretely

Six moments of the week, before and after.

Test design

Today

Cases written by hand as stories change, often incomplete.

With TuringOne

Scenarios drafted from the ticket and its context; the team reviews and approves them at Gate 1.

Automation

Today

An automation backlog that grows every sprint.

With TuringOne

Approved cases automated in your framework, ready to run.

Test data

Today

Data prepared by hand for every cycle.

With TuringOne

Data generated automatically for each scenario.

Maintenance

Today

Dozens of broken tests after each UI or API release.

With TuringOne

Scoped repairs you review as a small change; assertions never touched.

Failure triage

Today

Mornings lost reading logs to find out if it is a real bug.

With TuringOne

Each failure arrives qualified, test side or application side, with evidence and a drafted ticket.

Release decision

Today

“Can we ship?” answered with partial evidence.

With TuringOne

A quality report, indicators and open risks; the decision is recorded at Gate 2.

What you keep

You stay the quality owner.

Your judgement

Nothing is automated before cases are approved. Nothing ships without a human decision.

Your tools

Your framework, your pipeline, your tracker. No proprietary runner to learn or migrate to.

Your standards

Assertions are locked. No agent can make a test pass by weakening it.

Champion kit

Making the case internally?

Here is a short message you can adapt and forward to your management. It covers what decision makers ask about: control, risk, cost and proof.

I would like us to run a short pilot with TuringOne on one of our applications. It is an agentic quality engineering platform: it takes ready-to-test tickets and designs, automates, runs and analyses the tests inside our own framework and pipeline. Our QA team keeps control through two gates: we approve the test cases, and we decide the release. Data stays protected (read-only access, anonymised before any AI call, EU or in-house models) and the generated tests keep running without the tool, so there is no lock-in. The pilot takes 1 to 3 weeks on one scope, with 10 to 20 scenarios reviewed by us and our indicators measured before and after. To start, we only need to agree on the scope, a QA lead on our side and a date for a half-day framing workshop.

Questions you will be asked, and where to point

Next step

Bring one ticket. We'll show you the chain.

One end-to-end scope, 10 to 20 scenarios reviewed with your team, 1 to 3 weeks, indicators measured before and after. Three decisions are enough to start.